|

Details Matter: Why LP SmartSide Needs a Gap at Window Trim

What you might not see can sometimes make the biggest difference.

Stand back from a finished siding job and you notice the color, the straight courses and the window trim. Fair enough. You should like how your house looks.

But a clean-looking wall does not tell you how each joint was built. One example is the small space where the end of a siding board meets vertical window trim. For LP SmartSide primed lap siding, that space is part of the installation detail. It gives the board room to move before the joint is sealed.

That is the point of our side-by-side illustration: the finished appearance on one side, the enlarged detail on the other. The graphic is an illustrated installation detail, not a photograph of a Northern Exteriors job.

Illustration comparing a finished lp smartside window side-trim joint with an enlarged 3/16-inch space before sealant.

Small details. Big difference. This illustration shows a vertical window side-trim joint for primed lap siding; it is enlarged and not to scale.

Why leave a gap at window trim?

Engineered wood needs room to move as it adjusts to moisture conditions. LP’s explanation of SmartSide acclimation describes that movement. Cutting a board tight against the trim removes that room.

For the 38 and 76 Series primed lap products covered by LP’s current instructions, leave a 3/16-inch space where the siding ends meet window trim or door casings, then seal the joint. See page 1 of LP’s primed lap siding instructions.

The photograph-like side of our illustration shows the finished appearance. The diagram shows the space before sealant. You should not expect an unfinished opening at that side-trim joint.

The exact product and joint matter

A side-trim joint, a board-to-board butt joint and a drainage space above window flashing do different jobs. One gap rule cannot cover them all.

The current primed lap instructions give several ways to finish board-to-board butt joints. Follow the method for the product and joint being installed. A factory-designed ExpertFinish joint also deserves its own instruction sheet. Experience is useful. Checking the sheet is still part of the job.

The important exception around a window is above the head flashing. LP’s instructions show a minimum 3/8-inch clearance above horizontal flashing and identify it as a space that must not be caulked. Sealing a side-trim joint does not mean sealing a drainage exit above the window. See the window detail in the same LP instructions.

What the finished wall cannot show you

The graphic focuses on one small joint. It is not a complete window-flashing plan or a substitute for the manufacturer’s instructions.

On your own siding project, ask to see the work before it is covered. A few useful photographs and a clear explanation can answer more than a polished brochure:

  • Which siding product is being installed, and which instructions apply?
  • How will the joints at vertical trim be finished?
  • How will window flashing and the housewrap behind the siding be handled?
  • What will be documented before the siding covers the wall?
  • What maintenance will the finished siding and sealant need?

You do not need to become the job-site supervisor. You need a contractor who can explain the scope and show you the detail.

For a broader look at the wall assembly, read our guide to siding installation mistakes Minnesota homeowners should know. It covers flashing, fastening, clearances and wall conditions beyond this one joint.

Details matter at Northern Exteriors

Northern Exteriors has been family-owned in Cottage Grove since 2001. To us, experience should make the details easier to explain. It should never become an excuse to stop checking the instruction sheet.

When we discuss your siding project, bring the questions about the windows, trim and wall preparation along with the color samples. We can walk through the proposed scope with you. You deserve to understand what is included before work begins, including the parts that will be covered by the finished siding.

Compare the installation, along with the color

Picking the siding color is the fun part. Understanding the work behind it is what helps you compare proposals.

A useful written scope should make it clear what is included around windows, doors, trim and the wall behind the siding. If the description leaves you guessing, ask before the work starts.

Planning an LP SmartSide siding replacement in Cottage Grove, Woodbury, Hastings or Inver Grove Heights? Northern Exteriors MN Inc. can inspect the exterior and walk through the siding and trim scope with you. Learn about our Twin Cities siding services, or request a free siding estimate. Call or text 651-230-5103.

Family-owned since 2001. MN Lic. #BC297099.

Technical sources checked October 7, 2026. Requirements vary by product and can change. Follow the instructions that apply to the exact material and installation.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *